The appliance of science (and engineering) – Maple win new university contract

Posted by Jake Dunn on 23/06/21 00:00
MMU_SCIEng_Entrance_RETOUCH

Maple have won the contract to supply and install an architectural façade for the new science and engineering block at Manchester Metropolitan University.

We’ll use perforated vertical fins and solid horizontal blades for practical and visual reasons. Not only will the anodised façade shield the seven-storey building from direct sun and reduce solar gain, it will also create a striking gold-coloured feature on the building
 
Just like Maple’s 3D façade on the nearby Circle Square hotel and car park development, the project will demand all our expertise as well as close collaboration with contractor Charles Henshaw.
 
Metal just 3mm thick will create the sleek lines demanded by the design brief, but the fins will require internal stiffening frames to retain their integrity as they span between floors.
 
Work is scheduled to begin in January 2022. When complete, the development will replace the John Dalton West Building, which will be demolished, and connect to the John Dalton Tower.
 
The construction will create new facilities for research, deliver enhanced STEM education in collaborative working spaces, bring together different departments into a high-tech ‘super-lab’, and deliver world-class modern facilities to support the university’s ambitions.
 

SHARE ON SOCIAL

Share article on Linkedin

Download our rainscreen cladding brochure

Our class-leading rainscreen cladding system is designed for strength, performance and installation efficiency.

As well as meeting BS8414:2 2020 standards, the system design (from substructure to facing panels) has been tested for strength and undergone finite element analysis to offer superior performance

Download
Rainscreen Brochure Front Coverv3-1

You might also be interested in...

Posted by Jake Dunn on 23/06/21 00:00

The new net zero teaching facility is the latest completed development as part of the IoT network.

Read more

Posted by Jake Dunn on 23/06/21 00:00

We were responsible for the supply of solid and perforated fins for ‘The Dalton Building’ at MMU.

Read more

Posted by Jake Dunn on 23/06/21 00:00

The centre forms part of a £120 million nationwide programme to construct nine Institutes of Technology.

Read more