maple-signature-white.png

Maple have developed specialist teams of highly qualified on-site installers, who have decades of experience working on construction sites.

The installation process begins long before we get to site – with a thorough evaluation of the challenges and interfaces that are likely to occur. For example, we collaborate with steel, concrete and curtain walling contractors and other third-parties from day one to ensure our fixing requirements are incorporated into their designs. We identify logistical and access challenges, and collaborate with our own production colleagues on ‘just-in-time’ delivery schedules to ensure speedy installation with minimal impact on other trades.

Paddington MSCP, Liverpool

A complex design of perforated panels, each with a unique location, proved a challenge at Liverpool’s Paddington Central car park. Installation was completed on time and to fine margins on a challenging, tight and busy city-centre site.

Read more about the project

Paddington car park architectural facade image

Highly qualified – all our installers are certified to CSCS, IPAF and PASMA standards to allow them to work within health and safety guidelines

Collaboration – our Pluto louvre screening has been developed by our design, production and installation teams to create a system that’s lightweight and easy to install

Innovation – Maple’s new rainscreen cladding system reduces the time required to work at height, with patent-pending brackets and installation clips

Attention to detail - Maple work to tolerances as little as 1mm, so we liaise closely with other contractors whose tolerances may be greater

rotherham bus station expanded mesh facade